Welding automation by workpiece and process

We specify, build and commission robotic and laser welding cells. This page is organised the way a project actually starts: by the part you need to weld, then by the process that fits it.

How to read this page. We are an integrator, not a machine manufacturer. Nothing below is a catalogue rating: cycle time, first-pass yield and payback are measured on your samples during the trial weld and then written into the proposal.

Start from the workpiece

Structural steel and H-beams

Long straight seams, thick plate, heavy assemblies. Distortion and fit-up tolerance usually decide the process.

Process fit
MIG/MAG with seam tracking for thick sections; laser-arc hybrid where heat input and distortion are the constraint.
What changes the cell
Fixture weight, positioner capacity and reach at the extreme end of the beam.

Cycle time measured in trial weld · First-pass yield reported per project

Thin sheet and enclosures

Cabinets, panels, housings and covers where cosmetic finish and low distortion matter more than deposition rate.

Process fit
Fiber laser welding, often with a galvanized or coated-sheet pre-treatment step.
What changes the cell
Clamping pressure, gap tolerance and whether the seam is visible after painting.

Cycle time measured in trial weld · First-pass yield reported per project

Tube, pipe and fittings

Circular and profile tube joints, bicycle and furniture frames, handrails and manifold assemblies.

Process fit
Rotary positioner with MIG/MAG, or laser welding for small-diameter thin-wall tube.
What changes the cell
Chuck type, rotation speed matching and how the joint is presented to the torch.

Cycle time measured in trial weld · First-pass yield reported per project

Aluminium profiles and frames

Extrusions, battery trays, window and door frames, machine guards.

Process fit
MIG/MAG with push-pull torch, or laser welding with appropriate beam delivery for reflective alloys.
What changes the cell
Filler wire choice, cleaning before welding and fume extraction at the arc.

Cycle time measured in trial weld · First-pass yield reported per project

Pressure vessels and tanks

Shell and head seams, nozzles and flanges where procedure qualification is part of the contract.

Process fit
MIG/MAG or submerged arc for the main seams; laser where wall thickness allows.
What changes the cell
Whether the procedure already exists or has to be qualified on your samples.

Cycle time measured in trial weld · First-pass yield reported per project

Small machined and stamped parts

Brackets, sensor housings, connectors and other high-volume parts with short welds.

Process fit
Laser welding with a galvo head or a small robot cell, depending on joint access and volume.
What changes the cell
Part presentation, loading time and whether the cell needs to run unattended.

Cycle time measured in trial weld · First-pass yield reported per project

Start from the process

MIG/MAG robotic welding

The default for structural and general fabrication. We size the torch, wire feed and positioner around the joint, not the other way round.

Fiber laser welding

Narrow heat-affected zone and low distortion, best on thin sheet, tube and cosmetic seams. Keyhole or conduction mode depends on joint design.

Laser-arc hybrid

Adds arc filler to a laser keyhole for thicker sections and better gap bridging than laser alone.

Seam tracking and sensing

Laser or arc sensing retrofits for parts whose fit-up varies from piece to piece.

Positioners and turntables

Single or double station, chosen by part weight, rotation speed and whether loading happens inside or outside the cycle.

Safety, fume and integration

Guarding, light curtains, interlocks and extraction designed together with the cell, not added afterwards.

What we publish for every application

Four numbers decide whether a cell is worth building. All of them come out of the trial weld, not from a datasheet.

MetricHow it is establishedStatus
Cycle timeTimed on your samples with the proposed fixture and travel pathper project
First-pass yieldMeasured over a pilot batch, including rework causesper project
ChangeoverFixture swap and program recall time for the second and third part numberper project
PaybackCalculated from your labour rate, volume and scrap rateper project

Trial weld video

Trial weld footage

We publish a short clip for each application once the customer clears it. video to be added

Send a sample and get the first report

Not sure which of these fits your part?

Send a drawing or a photo of the joint. We will tell you which process fits before any hardware is discussed.