Welding automation case studies

Each study follows the same structure: the process as it ran before, the constraint that triggered the project, what was installed, and the result measured on the same parts.

Publication rule. A study is published only after the customer approves the text and the numbers. The cards below show the structure; customer name and measured values to be added after approval

Structural fabrication, thick plate

project title to be confirmed

Before
Manual MIG on long H-beam seams with rework on fit-up gaps.
Installed
Robotic cell with seam tracking and a two-station positioner.
After
Fewer rework hours per shift; distortion measured on the same fixture.
Cycle time
measured value pending
First-pass yield
measured value pending

Sheet metal enclosures

project title to be confirmed

Before
Visible weld marks and post-weld grinding on thin coated sheet.
Installed
Fiber laser welding with dedicated clamping and gap control.
After
Cosmetic seam accepted without grinding on the pilot batch.
Cycle time
measured value pending
First-pass yield
measured value pending

Tube assemblies

project title to be confirmed

Before
Changeover between three part numbers took most of the setup time.
Installed
Rotary positioner with recalled programs per part number.
After
Changeover measured as fixture swap plus program recall.
Cycle time
measured value pending
First-pass yield
measured value pending

What every study includes

Have a part that behaves like one of these?

Send it in. The trial weld report uses the same before-and-after structure, so you can compare it with your current process.